- 314 days on site
- 1 views
This home is approximately 75% complete. Drywall is mostly roughed in as are the windows. Sceptic system is installed as is a water well. The building permit is open. It has no current finals but can be reassigned for a new owner builder up to 2027. A trench is dug for electric which I believe has already been buried and is ready for the water line. There is a non permitted structure which can supply shelter as the home is finished. A construction loan is possible according to Island Mortgage source.
Source: Hawaii Information Services, MLS#: 723457
